Waipori

Waipori | CB | 600x400

Location
Waipori River
Otago

Commissioned
1907

Max Capacity
93 MW

Annual Output
189 GWh

Waipori means ‘dark water’ which describes how the water is often stained by peat swamps at the head waters. The Waipori Power Scheme consists of four power stations (Waipori 1A, 2A, 3 and 4). Situated in a steep, rocky gorge, it was first commissioned to power Dunedin and originally had a 3m native timber dam.

Lake Mahinerangi is popular for recreational fishing, and downstream the Waipori River is a valuable habitat for trout and native bird species.

More about us

About Contact

At Contact, we deliver great value. products, and service. We innovate based on customer feedback to shape the future.

Sustainability

We're committed to preserving natural resources for future generations of Kiwis, maintaining balance every day. 

Our projects

We've always got courageous and clever projects on the go to help generate renewable energy and manage our long-term impacts.

Contact Energy on YouTube Contact Energy on Facebook Contact Energy on Instagram Contact Energy on LinkedIn
© Contact Energy Ltd, All rights reserved 2026

For independent complaint or pricing advice, UDL, Billy & Powerswitch can help. 

Read our Residential Consumer Care policy on how we'll keep you safe and connected.